Concrete Calculator

By Asira Tools Team · Last updated 20 November 2026

Find out how much concrete your project needs — in cubic yards, cubic feet, and bags — before you order or start mixing.

Advertisement

Concrete Calculator

1.63 cubic yards
Volume44.00 cu ft
Volume (metric)1.25 m³
40 lb bags147 bags
60 lb bags98 bags
80 lb bags74 bags
Estimated weight6,600 lb

Bag yields use the standard figures: one 40 lb bag makes 0.3 cu ft, one 60 lb bag makes 0.45 cu ft, one 80 lb bag makes 0.6 cu ft. Weight assumes 150 lb per cubic foot.

Formulas:

Volume (cu ft) = Length (ft) × Width (ft) × Thickness (in) ÷ 12, then add the waste percentage

Volume (cu yd) = Volume (cu ft) ÷ 27

Bags needed = Volume (cu ft) ÷ bag yield, rounded up (0.3 cu ft per 40 lb bag, 0.45 cu ft per 60 lb bag, 0.6 cu ft per 80 lb bag)

Weight = Volume (cu ft) × 150 lb

What This Concrete Calculator Does

Concrete is sold by volume, and the volume you need depends on three measurements: how long the area is, how wide it is, and how thick the concrete will be. This calculator turns those three numbers into everything you need to order with confidence: cubic yards for a ready-mix truck, cubic feet and cubic metres for your own records, and bag counts for 40, 60, and 80 lb bags of pre-mixed concrete if you plan to mix it yourself.

It also adds a waste allowance, which is the part most people skip and then regret. Concrete work is messy in practice: forms flex, the ground underneath is never perfectly level, and some material always ends up on the shovel instead of in the slab. A 10% allowance covers all of that on a normal rectangular job. The calculator applies it before working out the bag counts, so every number you see already includes the buffer.

How to Use the Calculator

Start by measuring the length and width of the area in feet. For a patio, that is the inside of the forms; for a driveway, the full paved area. Then enter the thickness in inches. Four inches is the usual thickness for a patio or walkway, while driveways run 5 to 6 inches. Finally, set the waste allowance — 10% is the default and suits most jobs, but go to 15% if the ground is rough or the shape is irregular.

The results update as you type. The headline number is cubic yards, because that is the unit ready-mix suppliers use. If the number is under about 1 cubic yard, bags are usually the practical choice; above that, a truck delivery is normally cheaper and far less work. The bag counts are shown for all three common bag sizes so you can compare prices at the store, and the weight line tells you how much material you will be moving — useful when you are deciding whether you need extra help.

The Formula, Step by Step

The volume of a rectangular slab is length times width times thickness. The only complication is that length and width are measured in feet while thickness is measured in inches, so the thickness has to be divided by 12 to convert it to feet. A 12-foot by 10-foot patio at 4 inches thick is 12 × 10 × 4 ÷ 12 = 40 cubic feet. There are 27 cubic feet in a cubic yard, so that is 40 ÷ 27 = 1.48 cubic yards before waste, or 1.63 cubic yards with a 10% waste allowance.

Bag counts follow from the volume and the yield of each bag size. An 80 lb bag of pre-mixed concrete produces 0.6 cubic feet of finished concrete, a 60 lb bag produces 0.45 cubic feet, and a 40 lb bag produces 0.3 cubic feet. Divide the volume by the yield and round up, because you cannot buy part of a bag. The 40 cubic foot patio above needs 40 ÷ 0.6 = 67 bags at 80 lb, or 74 bags once the 10% waste allowance is added. The weight estimate uses the standard density of cured concrete, about 150 lb per cubic foot, which means a cubic yard weighs roughly 4,050 lb — just over 2 tons.

How Many Bags for Common Slab Sizes

The table below shows bag counts for common slab sizes at 4 inches thick, before any waste allowance. Add 10% to these numbers for a realistic order — for example, the 10 × 10 slab goes from 56 bags to 62 bags at 80 lb once waste is included.

Notice how fast the numbers grow. A 20 × 12 driveway section at 4 inches needs 134 bags at 80 lb each — that is over 10,000 lb of material to haul, mix, and place by hand. At that scale a ready-mix truck is not just cheaper, it is the only sane option. Bags win on small jobs: a single fence post, a small step, or a repair patch.

Worked Example: A 12 × 10 Patio

Suppose you are pouring a patio 12 feet long and 10 feet wide, 4 inches thick, and you want a 10% waste allowance. First the volume: 12 × 10 × 4 ÷ 12 = 40 cubic feet. With waste, that becomes 40 × 1.10 = 44 cubic feet. In cubic yards that is 44 ÷ 27 = 1.63 cubic yards, and in metric it is 44 × 0.0283168 = 1.25 cubic metres. The bag counts are 44 ÷ 0.6 = 74 bags at 80 lb, 44 ÷ 0.45 = 98 bags at 60 lb, and 44 ÷ 0.3 = 147 bags at 40 lb. The finished slab will weigh about 44 × 150 = 6,600 lb.

For ordering, a ready-mix supplier would round 1.63 cubic yards up to 1.75 cubic yards, since most sell in quarter-yard steps. If you went the bag route instead, 74 bags at roughly $6 each would cost about $444 before a mixer rental — which is why most people order a truck for a slab this size. Ready-mix typically runs $150 to $200 per cubic yard delivered, so the same patio costs roughly $245 to $325 from a truck, with far less labour.

Choosing the Right Slab Thickness

Thickness is the number that decides whether a slab lasts or cracks. Four inches is fine for anything that only carries people: patios, walkways, and shed floors. A driveway that carries cars needs 5 to 6 inches, because a car weighs around 4,000 lb and concentrates that weight on four small tyre patches. Anything heavier — an RV pad, a garage floor that holds a truck, or a farm yard — should be 6 inches or more, with steel reinforcement.

Every extra inch adds a quarter more concrete to a 4-inch slab, so thickness has a direct effect on cost. But skimping is a false economy: a 3-inch driveway slab will crack under a car within a year or two, and replacing it costs far more than the extra inch would have. When you are between two thicknesses, choose the thicker one and add reinforcement mesh or rebar. If your project needs rebar quantities too, the concrete slab calculator works out the grid for you.

Tips for a Good Pour

Measure the depth in several places. If the ground under the forms is uneven, the slab will be thicker in some spots than others. Measure at the corners and the middle, and use the largest depth — or the average plus extra waste — so you do not run short.

Round up when ordering. Running out of concrete halfway through a pour leaves a cold joint, a weak line where the first concrete started to set before the second load arrived. An extra quarter yard is cheap insurance against that.

Ask about short-load fees. Many suppliers charge extra for deliveries under 3 to 4 cubic yards. On a small slab that fee can push the per-yard price well above the headline rate, which is another reason bags sometimes win on tiny jobs.

Plan the barrow route. A standard wheelbarrow holds about 2 cubic feet, so moving one cubic yard takes about 14 trips. Work out where the truck can park and how far the concrete has to travel before the day of the pour.

Common Mistakes to Avoid

The most frequent mistake is entering the thickness in feet instead of inches. A 4-inch slab entered as 4 feet gives a volume 12 times too large — if your answer looks absurd, check the units first. The second mistake is forgetting waste entirely: a job calculated with zero waste will almost always run short, because forms bow outward under the weight of wet concrete and the sub-base is never perfectly flat.

The third mistake is measuring the outside of the forms rather than the finished slab, which inflates the volume slightly — or measuring the top of a sloped area and using the shallow depth everywhere. And finally, do not forget the weather. Concrete sets faster in heat, so on a hot day have extra hands ready and keep the surface damp while it cures. In cold weather, fresh concrete needs protection from freezing for at least 24 hours, or it will never reach full strength.

Advertisement

Frequently Asked Questions

How many 80 lb bags of concrete do I need for a 10x10 slab 4 inches thick?

56 bags before waste, or 62 bags with a 10% waste allowance. The slab is 10 x 10 x 4 / 12 = 33.33 cubic feet, and each 80 lb bag makes 0.6 cubic feet (33.33 / 0.6 = 55.6, rounded up to 56).

How many cubic yards is a 10x10 slab 4 inches thick?

1.23 cubic yards before waste, or 1.36 cubic yards with 10% waste. The volume is 33.33 cubic feet, and there are 27 cubic feet in a cubic yard (33.33 / 27 = 1.23).

What is the difference between 40, 60, and 80 lb bags of concrete?

They differ in yield: a 40 lb bag makes 0.3 cubic feet, a 60 lb bag makes 0.45 cubic feet, and an 80 lb bag makes 0.6 cubic feet. The 80 lb bag is usually the best value per cubic foot, but the 40 lb bag is easier to carry.

How thick should a concrete driveway be?

5 to 6 inches for a driveway carrying cars, with reinforcement mesh or rebar. Patios and walkways are fine at 4 inches, while RV pads and heavy-vehicle areas need 6 inches or more.

How much does a cubic yard of concrete weigh?

About 4,050 lb, or just over 2 tons. Concrete weighs roughly 150 lb per cubic foot, and a cubic yard holds 27 cubic feet (27 x 150 = 4,050).